ITAC Assessment: CO0596
ITAC logo
ITAC Assessment: CO0596
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 101,850
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,540
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,158 1,463,854
kWh
Electricity Demand $51,728 8,815
kW-mo/yr
Electricity Fees $1,787 -
Natural Gas $64,497 6,950
MMBtu
Fuel Oil #2 $180,000 9,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $244 $1,008 $111
2,756
kWh
$133
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,270 $33,120 $16,650
246,600
kWh
- - - $240 $380
03 2.8226: Increase efficiency of trucks $5,740 - - - - $5,740
-
MMBtu
- -
04 2.7442: Keep doors and windows shut when not on use $3,810 $1,000 - - $3,810
-
MMBtu
- - -
05 2.7131: Add area lighting switches $2,410 $100 $2,280
33,700
kWh
- - - $60 $70
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,120 $9,260 $2,090
31,000
kWh
- - - $10 $20
07 2.9114: Use solar heat to make electricty $1,100 $2,950 $1,100
15,200
kWh
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $910 $5,740 $630
9,300
kWh
- - - - $280
TOTAL RECOMMENDED $33,604 $53,178 $22,861
338,556
kWh
$133
-
kW-mo/yr
$3,810
-
MMBtu
$5,740
-
MMBtu
$310 $750
TOTAL IMPLEMENTED $30,094 $50,128 $19,481
289,656
kWh
$133
-
kW-mo/yr
$3,810
-
MMBtu
$5,740
-
MMBtu
$250 $680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs