Assessment Year | 2006 |
---|---|
Principal Product | Breakfast cereals |
NAICS | 311230: Breakfast Cereal Manufacturing |
SIC | 2043: Cereal Breakfast Foods |
Sales Range | less than $500 k |
# of Employees | 200 |
Plant Area |
176,100
ft2
|
Annual Production | 13,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Mexico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,015,524 | 26,820,000 |
kWh
|
$0.038 |
Electricity Demand | $493,447 | 50,734 |
kW-mo/yr
|
$9.73 |
Electricity Fees | $68,434 | - |
|
- |
Natural Gas | $1,494,479 | 149,959 |
MMBtu
|
$9.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $371,480 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,490 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $264,540 | $1,173,000 |
$186,670
4,943,300
kWh
|
$77,870
-
kW-mo/yr
|
- | - | |
02 | 2.2692: Use outside cold water source as a supply of cooling water | $56,580 | $570 |
$40,430
1,079,000
kWh
|
$16,150
-
kW-mo/yr
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $950 | $500 | - | - |
$950
-
MMBtu
|
- | |
04 | 2.7233: Use properly designed and sized hvac equipment | $23,960 | - |
$17,120
456,800
kWh
|
$6,840
-
kW-mo/yr
|
- | - | |
05 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $21,540 | $100,800 |
$11,050
322,600
kWh
|
$10,490
-
kW-mo/yr
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $3,910 | $32,600 |
$1,100
23,000
kWh
|
$870
-
kW-mo/yr
|
- | $1,940 | |
TOTAL RECOMMENDED | $371,480 | $1,307,470 |
$256,370
6,824,700
kWh
|
$112,220
-
kW-mo/yr
|
$950
-
MMBtu
|
$1,940 | ||
TOTAL IMPLEMENTED | $81,490 | $1,070 |
$57,550
1,535,800
kWh
|
$22,990
-
kW-mo/yr
|
$950
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs