ITAC Assessment: CO0586
ITAC logo
ITAC Assessment: CO0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Bakery mixes
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $50
M
to 100
M
# of Employees 97
Plant Area 161,570
ft2
Annual Production 130,000,000
lb
Production Hrs. Annual 6,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,109 4,464,494
kWh
Electricity Demand $140,169 9,778
kW-mo/yr
Electricity Fees $298 -
Natural Gas $246,012 27,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,480 $25,000 - - $8,480
-
MMBtu
- -
02 2.2511: Insulate bare equipment $1,790 $890 - - $1,790
-
MMBtu
- -
03 2.4221: Install compressor air intakes in coolest locations $1,410 $1,140 $880
25,500
kWh
$530
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $1,310 $4,290 $570
16,600
kWh
$430
-
kW-mo/yr
- $160 $150
05 2.4133: Use most efficient type of electric motors $287 $168 $104
3,014
kWh
$183
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,470 $18,840 $3,330
96,700
kWh
$2,440
-
kW-mo/yr
- $1,530 $1,170
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,160 $3,580 $820
23,900
kWh
$1,310
-
kW-mo/yr
- $20 $10
08 2.7142: Utilize higher efficiency lamps and/or ballasts $420 $790 $140
4,100
kWh
$90
-
kW-mo/yr
- $30 $160
TOTAL RECOMMENDED $24,327 $54,698 $5,844
169,814
kWh
$4,983
-
kW-mo/yr
$10,270
-
MMBtu
$1,740 $1,490
TOTAL IMPLEMENTED $3,620 $2,820 $1,020
29,600
kWh
$620
-
kW-mo/yr
$1,790
-
MMBtu
$30 $160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs