| Assessment Year | 2006 |
|---|---|
| Principal Product | Bakery mixes |
| NAICS | 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour |
| SIC | 2045: Prepared Flour Mixes and Doughs |
| Sales Range | $50 M to 100M |
| # of Employees | 97 |
| Plant Area |
161,570
ft2
|
| Annual Production | 130,000,000
lb
|
| Production Hrs. Annual | 6,760
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $172,109 | 4,464,494 |
kWh
|
$0.039 |
| Electricity Demand | $140,169 | 9,778 |
kW-mo/yr
|
$14.34 |
| Electricity Fees | $298 | - |
|
- |
| Natural Gas | $246,012 | 27,376 |
MMBtu
|
$8.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,327 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,620 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $8,480 | $25,000 | - | - |
$8,480
-
MMBtu
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $1,790 | $890 | - | - |
$1,790
-
MMBtu
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,410 | $1,140 |
$880
25,500
kWh
|
$530
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4314: Use synthetic lubricant | $1,310 | $4,290 |
$570
16,600
kWh
|
$430
-
kW-mo/yr
|
- | $160 | $150 | |
| 05 | 2.4133: Use most efficient type of electric motors | $287 | $168 |
$104
3,014
kWh
|
$183
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,470 | $18,840 |
$3,330
96,700
kWh
|
$2,440
-
kW-mo/yr
|
- | $1,530 | $1,170 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,160 | $3,580 |
$820
23,900
kWh
|
$1,310
-
kW-mo/yr
|
- | $20 | $10 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $420 | $790 |
$140
4,100
kWh
|
$90
-
kW-mo/yr
|
- | $30 | $160 | |
| TOTAL RECOMMENDED | $24,327 | $54,698 |
$5,844
169,814
kWh
|
$4,983
-
kW-mo/yr
|
$10,270
-
MMBtu
|
$1,740 | $1,490 | ||
| TOTAL IMPLEMENTED | $3,620 | $2,820 |
$1,020
29,600
kWh
|
$620
-
kW-mo/yr
|
$1,790
-
MMBtu
|
$30 | $160 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs