ITAC Assessment: CO0563
ITAC logo
ITAC Assessment: CO0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aluminum Lids
NAICS 332431: Metal Can Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 118
Plant Area 200,500
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,322 12,860,529
kWh
Natural Gas $56,363 10,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $56,710 $346,448 $45,100
1,392,900
kWh
$11,610
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $26,550 $89,981 $33,550
1,036,000
kWh
- - $(-7,000.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,440 $9,180 $1,520
47,000
kWh
$1,920
-
kW-mo/yr
- -
04 2.4314: Use synthetic lubricant $2,710 $1,660 $1,470
45,500
kWh
$1,200
-
kW-mo/yr
- $40
05 2.6218: Turn off equipment when not in use $820 - $450
13,900
kWh
$370
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,330 $26,160 $8,460
261,400
kWh
$4,880
-
kW-mo/yr
$(-240.0) $(-770.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,040 $26,010 $3,560
109,900
kWh
$4,600
-
kW-mo/yr
$220 $(-340.0)
TOTAL RECOMMENDED $110,600 $499,439 $94,110
2,906,600
kWh
$24,580
-
kW-mo/yr
$(-20.0) $(-8,070.0)
TOTAL IMPLEMENTED $104,450 $488,599 $91,120
2,814,100
kWh
$21,460
-
kW-mo/yr
$(-20.0) $(-8,110.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs