Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Frozen baked goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 83,600
ft2
Annual Production 1,250,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,175 8,519,280
kWh
Electricity Demand $129,558 16,195
kW-mo/yr
Electricity Fees $360 -
Natural Gas $111,592 16,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $20,790 $33,000 $(-270.0)
(-7,700)
kWh
$(-140.0)
-
kW-mo/yr
$21,200 -
02 2.4133: Use most efficient type of electric motors $718 $876 $543
15,498
kWh
$175
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $400 $950 $280
7,900
kWh
$120
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,140 $4,690 $2,200
62,800
kWh
$970
-
kW-mo/yr
$(-20.0) $990
05 2.7135: Install occupancy sensors $3,060 $4,520 $2,330
66,500
kWh
$730
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,344 $508 $1,274
36,398
kWh
$399
-
kW-mo/yr
- $(-329.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,330 $1,380 $130
3,600
kWh
$40
-
kW-mo/yr
$640 $520
08 2.7425: Clean or color roof to reduce solar load $910 $5,730 $690
19,800
kWh
$220
-
kW-mo/yr
- -
TOTAL RECOMMENDED $32,692 $51,654 $7,177
204,796
kWh
$2,514
-
kW-mo/yr
$21,820 $1,181
TOTAL IMPLEMENTED $718 $876 $543
15,498
kWh
$175
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs