ITAC Assessment: CO0550
ITAC logo
ITAC Assessment: CO0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Passenger railcars
NAICS 336510: Railroad Rolling Stock Manufacturing
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 87,040
ft2
Annual Production 6
pieces
Production Hrs. Annual 2,700
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,990 667,520
kWh
Electricity Demand $40,295 2,918
kW-mo/yr
Electricity Fees $1,008 -
Natural Gas $33,653 4,621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $1,960 $2,000 - - $1,960
-
MMBtu
- - - -
02 3.8142: Distill contaminated solvents for reuse $1,720 $6,070 - $(-70.0)
-
kW-mo/yr
- $1,600
-
gal
$(-500.0) - $690
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,000 $180 $330
8,900
kWh
$670
-
kW-mo/yr
- - - - -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $590 $3,520 $110
3,000
kWh
$480
-
kW-mo/yr
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $490 - $190
5,100
kWh
$300
-
kW-mo/yr
- - - - -
06 2.7243: Improve air circulation with destratification fans / other methods $6,160 $23,870 $(-710.0)
(-19,000)
kWh
$(-360.0)
-
kW-mo/yr
$7,230
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,040 $77,000 $1,490
39,700
kWh
$2,430
-
kW-mo/yr
- - $80 - $40
08 2.8121: Apply for tax-free status for energy purchases $2,570 $1,000 - - - - - $2,570 -
09 2.7491: Insulate glazing, walls, ceilings, and roofs $2,210 $17,000 - - $2,210
-
MMBtu
- - - -
10 2.7131: Add area lighting switches $2,070 $4,850 $690
18,400
kWh
$1,260
-
kW-mo/yr
- - $60 - $60
11 4.821: Pay bills on time to avoid late fees $390 - - - - - - $390 -
TOTAL RECOMMENDED $23,200 $135,490 $2,100
56,100
kWh
$4,710
-
kW-mo/yr
$11,400
-
MMBtu
$1,600
-
gal
$(-360.0) $2,960 $790
TOTAL IMPLEMENTED $8,580 $11,550 $1,130
30,300
kWh
$2,410
-
kW-mo/yr
$1,960
-
MMBtu
- $60 $2,960 $60
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs