ITAC Assessment: CO0541
ITAC logo
ITAC Assessment: CO0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Commercial lithographic printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 91
Plant Area 84,000
ft2
Annual Production 4,400,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,209 1,462,711
kWh
Electricity Demand $81,474 102,523
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $31,783 5,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,090 $580 $1,700
60,700
kWh
$2,390
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,070 $560 - $1,070
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $810 $350 $470
16,800
kWh
$340
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $380 $310 $160
5,600
kWh
$220
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,670 $8,550 $1,380
44,600
kWh
$1,670
-
kW-mo/yr
- $(-380.0)
06 2.7134: Use photocell controls $740 $510 $330
11,500
kWh
$330
-
kW-mo/yr
$60 $20
07 2.6123: Remove unneeded service lines to eliminate potential leaks $610 $30 $30
1,200
kWh
$580
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,370 $10,890 $4,070
140,400
kWh
$6,600
-
kW-mo/yr
$60 $(-360.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs