Assessment Year | 2004 |
---|---|
Principal Product | Commercial lithographic printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 91 |
Plant Area |
84,000
ft2
|
Annual Production | 4,400,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,209 | 1,462,711 |
kWh
|
$0.029 |
Electricity Demand | $81,474 | 102,523 |
kW-mo/yr
|
$0.79 |
Electricity Fees | $1,800 | - |
|
- |
Natural Gas | $31,783 | 5,594 |
MMBtu
|
$5.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,090 | $580 |
$1,700
60,700
kWh
|
$2,390
-
kW-mo/yr
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,070 | $560 | - |
$1,070
-
kW-mo/yr
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $810 | $350 |
$470
16,800
kWh
|
$340
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $380 | $310 |
$160
5,600
kWh
|
$220
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,670 | $8,550 |
$1,380
44,600
kWh
|
$1,670
-
kW-mo/yr
|
- | $(-380.0) | |
06 | 2.7134: Use photocell controls | $740 | $510 |
$330
11,500
kWh
|
$330
-
kW-mo/yr
|
$60 | $20 | |
07 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $610 | $30 |
$30
1,200
kWh
|
$580
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $10,370 | $10,890 |
$4,070
140,400
kWh
|
$6,600
-
kW-mo/yr
|
$60 | $(-360.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs