Assessment Year | 2003 |
---|---|
Principal Product | Fabricated sheet metal products |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
108,443
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,318
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,483 | 2,049,700 |
kWh
|
$0.046 |
Electricity Demand | $47,651 | 5,504 |
kW-mo/yr
|
$8.66 |
Electricity Fees | $226 | - |
|
- |
Natural Gas | $51,083 | 9,207 |
MMBtu
|
$5.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,550 | $32,870 | n/a |
$8,720
227,000
kWh
|
$5,760
-
kW-mo/yr
|
- | $(-1,930.0) |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,830 | $10,000 | - |
$6,830
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,650 | $260 |
$1,800
46,700
kWh
|
$850
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,219 | $246 |
$1,436
37,355
kWh
|
$900
-
kW-mo/yr
|
- | $(-117.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,440 | $1,800 |
$940
24,500
kWh
|
$500
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,370 | $350 |
$1,050
27,300
kWh
|
$320
-
kW-mo/yr
|
- | - | |
07 | 2.4226: Use / purchase optimum sized compressor | $1,030 | $120 |
$1,030
26,800
kWh
|
- | - | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $3,540 | $500 | - | - | $3,540 | - | |
TOTAL RECOMMENDED | $31,629 | $46,146 |
$14,976
389,655
kWh
|
$15,160
-
kW-mo/yr
|
$3,540 | $(-2,047.0) | ||
TOTAL IMPLEMENTED | $7,560 | $1,110 |
$2,850
74,000
kWh
|
$1,170
-
kW-mo/yr
|
$3,540 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs