Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Sub-bituminous coal
NAICS 212111: Bituminous Coal and Lignite Surface Mining
SIC 1221: Bituminous Coal and Lignite Surface Mining
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 20,000,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $539,951 31,461,500
kWh
Electricity Demand $500,576 69,087
kW-mo/yr
Electricity Fees $5,700 -
Natural Gas $79,358 22,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4325: Upgrade conveyors $19,310 $46,220 $10,550
560,200
kWh
$5,830
-
kW-mo/yr
$1,440 $1,490
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,122 $26,560 $2,799
148,656
kWh
$2,372
-
kW-mo/yr
$342 $(-391.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,530 $6,580 $1,380
73,400
kWh
$1,150
-
kW-mo/yr
- -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,160 $4,000 $770
40,800
kWh
$390
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $110 $220
11,800
kWh
$110
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $139 $139 $82
4,351
kWh
$69
-
kW-mo/yr
- $(-12.0)
TOTAL RECOMMENDED $28,591 $83,609 $15,801
839,207
kWh
$9,921
-
kW-mo/yr
$1,782 $1,087
TOTAL IMPLEMENTED $8,121 $33,389 $4,481
238,207
kWh
$3,701
-
kW-mo/yr
$342 $(-403.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs