ITAC Assessment: CO0515
ITAC logo
ITAC Assessment: CO0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product gold
NAICS 212221: Gold Ore Mining
SIC 1041: Gold Ores
Sales Range greater than $500
M
# of Employees 1,700
Plant Area 200,000
ft2
Annual Production 146,341
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,135,414 1,044,341,439
kWh
Electricity Demand $7,825,177 2,209,688
kW-mo/yr
Electricity Fees $1,592,977 -
LPG $9,835,981 2,052,434
MMBtu
Fuel Oil #2 $16,806,213 2,849,064
MMBtu
Other Energy $460,928 43,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,111,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $334,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $167,740 $45,000 $134,330
2,604,800
kWh
$33,410
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $66,100 $24,160 $71,840
1,393,300
kWh
$17,810
-
kW-mo/yr
- - $(-23,550.0) -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $50,000 $26,000 - - - - $50,000 -
04 4.611: Begin a practice of predictive / preventative maintenance $50,200 $4,800 - - - - $50,200 -
05 3.6124: Burn waste oil for heat $34,520 $18,000 - - $29,520
-
MMBtu
$5,000
-
gal
- -
06 2.4239: Eliminate or reduce compressed air usage $241,800 $105,900 $193,780
3,757,600
kWh
$48,020
-
kW-mo/yr
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $187,930 $102,500 - - $187,930
-
MMBtu
- - -
08 2.9121: Install wind powered electric generator $6,313,200 $48,000,000 $5,421,040
105,120,000
kWh
- - - - $892,160
TOTAL RECOMMENDED $7,111,490 $48,326,360 $5,820,990
112,875,700
kWh
$99,240
-
kW-mo/yr
$217,450
-
MMBtu
$5,000
-
gal
$76,650 $892,160
TOTAL IMPLEMENTED $334,040 $99,960 $206,170
3,998,100
kWh
$51,220
-
kW-mo/yr
- - $76,650 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs