Assessment Year | 2002 |
---|---|
Principal Product | Semiconductor materials |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
27,000
ft2
|
Annual Production | 250,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $199,247 | 5,208,600 |
kWh
|
$0.038 |
Electricity Demand | $87,448 | 19,085 |
kW-mo/yr
|
$4.58 |
Electricity Fees | $8,808 | - |
|
- |
Natural Gas | $25,096 | 4,204 |
MMBtu
|
$5.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,420 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $12,040 | $9,500 |
$8,560
294,200
kWh
|
$3,480
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $10,160 | $14,010 | - |
$10,160
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $4,380 | $990 |
$4,380
150,600
kWh
|
- | - | - | |
04 | 2.7234: Use heat pump for space conditioning | $4,020 | - |
$2,990
102,700
kWh
|
$1,030
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,420 | $190 |
$2,070
71,200
kWh
|
$710
-
kW-mo/yr
|
$(-360.0) | - | |
06 | 2.3191: Use demand controller or load shedder | $2,290 | $1,200 | - |
$3,490
-
kW-mo/yr
|
- | $(-1,200.0) | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $370 | $300 |
$280
9,500
kWh
|
$90
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | - |
$1,070
36,000
kWh
|
$480
-
kW-mo/yr
|
$20 | $(-1,230.0) | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $100 | - |
$100
3,600
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $36,120 | $26,190 |
$19,450
667,800
kWh
|
$19,440
-
kW-mo/yr
|
$(-340.0) | $(-2,430.0) | ||
TOTAL IMPLEMENTED | $2,420 | $190 |
$2,070
71,200
kWh
|
$710
-
kW-mo/yr
|
$(-360.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs