ITAC Assessment: CO0511
ITAC logo
ITAC Assessment: CO0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Semiconductor materials
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 27,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,247 5,208,600
kWh
Electricity Demand $87,448 19,085
kW-mo/yr
Electricity Fees $8,808 -
Natural Gas $25,096 4,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $12,040 $9,500 $8,560
294,200
kWh
$3,480
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $10,160 $14,010 - $10,160
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $4,380 $990 $4,380
150,600
kWh
- - -
04 2.7234: Use heat pump for space conditioning $4,020 - $2,990
102,700
kWh
$1,030
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,420 $190 $2,070
71,200
kWh
$710
-
kW-mo/yr
$(-360.0) -
06 2.3191: Use demand controller or load shedder $2,290 $1,200 - $3,490
-
kW-mo/yr
- $(-1,200.0)
07 2.7111: Reduce illumination to minimum necessary levels $370 $300 $280
9,500
kWh
$90
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $340 - $1,070
36,000
kWh
$480
-
kW-mo/yr
$20 $(-1,230.0)
09 2.7221: Lower temperature during the winter season and vice-versa $100 - $100
3,600
kWh
- - -
TOTAL RECOMMENDED $36,120 $26,190 $19,450
667,800
kWh
$19,440
-
kW-mo/yr
$(-340.0) $(-2,430.0)
TOTAL IMPLEMENTED $2,420 $190 $2,070
71,200
kWh
$710
-
kW-mo/yr
$(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs