ITAC Assessment: CO0499
ITAC logo
ITAC Assessment: CO0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Injection molded plastics parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area 44,450
ft2
Annual Production 13,900,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,176 2,969,880
kWh
Electricity Demand $68,242 7,063
kW-mo/yr
Electricity Fees $132 -
Natural Gas $3,296 291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,240 $84,240 $16,870
537,900
kWh
$9,370
-
kW-mo/yr
- - - -
02 2.3191: Use demand controller or load shedder $3,480 $7,000 - $3,480
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $610 $260 $620
19,900
kWh
$350
-
kW-mo/yr
- $(-360.0) - -
04 2.7442: Keep doors and windows shut when not on use $540 $900 - - $540
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $190 - $970
30,900
kWh
$590
-
kW-mo/yr
- $(-460.0) - $(-910.0)
06 4.211: Consider use / purchase of bulk materials where possible $105,600 $120,000 - - - - $45,600 $60,000
TOTAL RECOMMENDED $136,660 $212,400 $18,460
588,700
kWh
$13,790
-
kW-mo/yr
$540
-
MMBtu
$(-820.0) $45,600 $59,090
TOTAL IMPLEMENTED $4,820 $8,160 $1,590
50,800
kWh
$4,420
-
kW-mo/yr
$540
-
MMBtu
$(-820.0) - $(-910.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs