ITAC Assessment: CO0498
ITAC logo
ITAC Assessment: CO0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Natural gas compressors and wheelchair lifts
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 56,600
ft2
Annual Production 35
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,321 798,400
kWh
Electricity Demand $38,803 2,868
kW-mo/yr
Electricity Fees $196 -
Natural Gas $51,920 7,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $3,880 $7,000 - $3,880
-
kW-mo/yr
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $2,910 $5,800 - - $2,910
-
MMBtu
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,110 $7,530 - - $2,110
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $410 - $1,040
62,100
kWh
$3,770
-
kW-mo/yr
- $(-1,370.0) $(-3,030.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $380 $210 $280
16,600
kWh
$700
-
kW-mo/yr
- $(-600.0) -
06 4.513: Re-arrange equipment layout to reduce labor costs $71,500 $3,200 - - - $71,500 -
TOTAL RECOMMENDED $81,190 $23,740 $1,320
78,700
kWh
$8,350
-
kW-mo/yr
$5,020
-
MMBtu
$69,530 $(-3,030.0)
TOTAL IMPLEMENTED $75,200 $9,210 $1,320
78,700
kWh
$4,470
-
kW-mo/yr
$2,910
-
MMBtu
$69,530 $(-3,030.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs