Assessment Year | 2001 |
---|---|
Principal Product | injection molded plastic parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
92,500
ft2
|
Annual Production | 7,362,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,196 | 8,369,458 |
kWh
|
$0.017 |
Electricity Demand | $220,896 | 15,447 |
kW-mo/yr
|
$14.30 |
Electricity Fees | $2,699 | - |
|
- |
Natural Gas | $47,423 | 5,465 |
MMBtu
|
$8.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $110,530 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $10,250 | $12,000 | n/a | - |
$10,250
-
kW-mo/yr
|
- | - | - | - |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,610 | $22,110 |
$3,070
181,600
kWh
|
$3,540
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,470 | $7,170 | - | - |
$2,470
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,230 | $440 |
$1,460
86,300
kWh
|
$1,680
-
kW-mo/yr
|
- | $(-910.0) | - | - | |
05 | 2.2511: Insulate bare equipment | $770 | $430 |
$670
39,500
kWh
|
$770
-
kW-mo/yr
|
$(-670.0)
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $90 | - |
$1,060
62,600
kWh
|
$1,670
-
kW-mo/yr
|
- | $(-840.0) | - | $(-1,800.0) | |
07 | 4.513: Re-arrange equipment layout to reduce labor costs | $87,600 | $6,280 | - | - | - | $87,600 | - | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $10,760 | $250 | - | - | - | - | $10,760 | - | |
TOTAL RECOMMENDED | $120,780 | $48,680 |
$6,260
370,000
kWh
|
$17,910
-
kW-mo/yr
|
$1,800
-
MMBtu
|
$85,850 | $10,760 | $(-1,800.0) | ||
TOTAL IMPLEMENTED | $110,530 | $36,680 |
$6,260
370,000
kWh
|
$7,660
-
kW-mo/yr
|
$1,800
-
MMBtu
|
$85,850 | $10,760 | $(-1,800.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs