ITAC Assessment: CO0495
ITAC logo
ITAC Assessment: CO0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Beef
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 67,000
ft2
Annual Production 5,200,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,341 2,084,600
kWh
Electricity Demand $62,207 4,492
kW-mo/yr
Electricity Fees $1,621 -
Natural Gas $9,153 1,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.3191: Use demand controller or load shedder $6,590 $17,000 - $6,590
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $1,860 $500 $590
36,200
kWh
$1,270
-
kW-mo/yr
- - - -
03 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $470 $500 $470
29,000
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $250 - $350
21,700
kWh
$920
-
kW-mo/yr
- $(-340.0) $(-680.0) -
05 3.5217: Reuse / recycle/ sell paper products $9,900 $1,000 - - $5,700
-
lb
$(-1,790.0) - $5,990
TOTAL RECOMMENDED $19,070 $19,000 $1,410
86,900
kWh
$8,780
-
kW-mo/yr
$5,700
-
lb
$(-2,130.0) $(-680.0) $5,990
TOTAL IMPLEMENTED $19,070 $19,000 $1,410
86,900
kWh
$8,780
-
kW-mo/yr
$5,700
-
lb
$(-2,130.0) $(-680.0) $5,990
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs