Assessment Year | 2001 |
---|---|
Principal Product | Beef |
NAICS |
n/a
|
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 69 |
Plant Area |
67,000
ft2
|
Annual Production | 5,200,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,341 | 2,084,600 |
kWh
|
$0.016 |
Electricity Demand | $62,207 | 4,492 |
kW-mo/yr
|
$13.85 |
Electricity Fees | $1,621 | - |
|
- |
Natural Gas | $9,153 | 1,827 |
MMBtu
|
$5.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $6,590 | $17,000 | - |
$6,590
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $1,860 | $500 |
$590
36,200
kWh
|
$1,270
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $470 | $500 |
$470
29,000
kWh
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $250 | - |
$350
21,700
kWh
|
$920
-
kW-mo/yr
|
- | $(-340.0) | $(-680.0) | - | |
05 | 3.5217: Reuse / recycle/ sell paper products | $9,900 | $1,000 | - | - |
$5,700
-
lb
|
$(-1,790.0) | - | $5,990 | |
TOTAL RECOMMENDED | $19,070 | $19,000 |
$1,410
86,900
kWh
|
$8,780
-
kW-mo/yr
|
$5,700
-
lb
|
$(-2,130.0) | $(-680.0) | $5,990 | ||
TOTAL IMPLEMENTED | $19,070 | $19,000 |
$1,410
86,900
kWh
|
$8,780
-
kW-mo/yr
|
$5,700
-
lb
|
$(-2,130.0) | $(-680.0) | $5,990 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs