ITAC Assessment: CO0492
ITAC logo
ITAC Assessment: CO0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Coal
NAICS
n/a
SIC 1221: Bituminous Coal and Lignite Surface Mining
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 65,000
ft2
Annual Production 2,100,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,399,690 22,330,000
kWh
Electricity Fees $836 -
Natural Gas $98,015 9,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $8,100 $1,470 $8,100
129,200
kWh
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $6,010 $8,660 $(-200.0)
(-3,200)
kWh
$6,210
-
MMBtu
- -
03 2.9111: Use solar heat to heat make-up air $4,980 $29,800 $(-330.0)
(-5,300)
kWh
$5,310
-
MMBtu
- -
04 2.7221: Lower temperature during the winter season and vice-versa $3,040 $6,460 - $3,040
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $2,280 $2,060 - $2,280
-
MMBtu
- -
06 2.7221: Lower temperature during the winter season and vice-versa $2,160 $3,610 $1,210
19,320
kWh
$950
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $130 - $1,620
25,900
kWh
- $(-510.0) $(-980.0)
TOTAL RECOMMENDED $26,700 $52,060 $10,400
165,920
kWh
$17,790
-
MMBtu
$(-510.0) $(-980.0)
TOTAL IMPLEMENTED $3,040 $6,460 - $3,040
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs