ITAC Assessment: CO0481
ITAC logo
ITAC Assessment: CO0481
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product contract manufacturer of medical, communications and misc. e
NAICS
n/a
SIC 3826: Laboratory Analytical Instruments
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 64,350
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,293 699,100
kWh
Electricity Demand $17,982 1,917
kW-mo/yr
Electricity Fees $120 -
Natural Gas $7,077 1,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $1,690 $2,000 - $1,690
-
kW-mo/yr
- - -
02 2.7124: Make a practice of turning off lights when not needed $1,370 - $1,370
45,000
kWh
- - - -
03 2.7221: Lower temperature during the winter season and vice-versa $1,230 $880 - - $1,230
-
MMBtu
- -
04 2.6218: Turn off equipment when not in use $1,030 - $1,030
33,800
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $870 $130 $670
22,100
kWh
$560
-
kW-mo/yr
- - $(-360.0)
06 2.2211: Use optimum temperature $820 $2,330 - - $820
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $480 $30 $260
8,400
kWh
$220
-
kW-mo/yr
- - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $300 $130 - - $300
-
MMBtu
- -
09 3.5316: Contract a wood pallet recycling company $160 - - - - $160
-
lb
-
TOTAL RECOMMENDED $7,950 $5,500 $3,330
109,300
kWh
$2,470
-
kW-mo/yr
$2,350
-
MMBtu
$160
-
lb
$(-360.0)
TOTAL IMPLEMENTED $5,780 $3,470 $3,070
100,900
kWh
$560
-
kW-mo/yr
$2,350
-
MMBtu
$160
-
lb
$(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs