ITAC Assessment: CO0469
ITAC logo
ITAC Assessment: CO0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product prepared meat products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 22,000
ft2
Annual Production 1,075,800
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,972 857,562
kWh
Electricity Demand $9,537 3,705
kW-mo/yr
Electricity Fees $144 -
Natural Gas $11,224 2,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $3,000 $9,500 $2,840
47,773
kWh
$160
-
kW-mo/yr
- - - - -
02 2.2437: Recover waste heat from equipment $860 $2,270 - - $860
-
MMBtu
- - - -
03 2.2511: Insulate bare equipment $590 $1,510 $590
9,965
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $350 - $350
5,862
kWh
$50
-
kW-mo/yr
- - $(-30.0) $(-20.0) -
05 3.6192: Use a less expensive method of waste removal $730 $50 - - - $730
-
lb
- - -
06 4.446: Automate finishing process $27,300 $20,000 - - - - $22,100 - $5,200
07 4.441: Install automatic packing equipment $22,100 $9,000 - - - - $22,100 - -
08 4.513: Re-arrange equipment layout to reduce labor costs $2,080 $1,200 - - - - $2,080 - -
TOTAL RECOMMENDED $57,010 $43,530 $3,780
63,600
kWh
$210
-
kW-mo/yr
$860
-
MMBtu
$730
-
lb
$46,250 $(-20.0) $5,200
TOTAL IMPLEMENTED $28,850 $21,260 $3,780
63,600
kWh
$210
-
kW-mo/yr
- $730
-
lb
$24,150 $(-20.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs