ITAC Assessment: CO0463
ITAC logo
ITAC Assessment: CO0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product flock transfers
NAICS
n/a
SIC 2390:
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 61,500
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,041 1,238,277
kWh
Electricity Demand $46,544 3,565
kW-mo/yr
Electricity Fees $192 -
Natural Gas $30,266 7,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,240 $26,000 $5,010
301,290
kWh
$10,820
-
kW-mo/yr
$(-5,590.0)
-
MMBtu
- - - - - -
02 2.3191: Use demand controller or load shedder $4,710 $7,500 - $4,710
-
kW-mo/yr
- - - - - - -
03 2.7314: Reduce ventilation air $1,500 $1,900 $80
4,982
kWh
$310
-
kW-mo/yr
$1,110
-
MMBtu
- - - - - -
04 2.7111: Reduce illumination to minimum necessary levels $1,260 $1,260 $400
24,033
kWh
$860
-
kW-mo/yr
- - - - - - -
05 2.7224: Reduce space conditioning during non-working hours $700 $1,870 $160
9,965
kWh
$(-50.0)
-
kW-mo/yr
$590
-
MMBtu
- - - - - -
06 2.7135: Install occupancy sensors $310 $900 $190
11,723
kWh
$120
-
kW-mo/yr
- - - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $200 $410 $190
11,137
kWh
$400
-
kW-mo/yr
- - - $(-390.0) - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $150 - $410
24,326
kWh
$850
-
kW-mo/yr
- - - $(-320.0) - $(-790.0) -
09 3.5242: Recover metals from spent solutions and recycle $800 $250 - - - - $1,050
-
gal
- - $(-250.0) -
10 3.4154: Eliminate leaks in water lines and valves $190 $300 - - $40
-
MMBtu
$70
-
Tgal
- - - - $80
-
Tgal
11 4.446: Automate finishing process $37,380 $30,000 - - - - - $18,690 - $18,690 -
12 2.8113: Purchase gas directly from a contract gas supplier $3,410 $500 - - - - - - $3,410 - -
TOTAL RECOMMENDED $60,850 $70,890 $6,440
387,456
kWh
$18,020
-
kW-mo/yr
$(-3,850.0)
-
MMBtu
$70
-
Tgal
$1,050
-
gal
$17,980 $3,410 $17,650 $80
-
Tgal
TOTAL IMPLEMENTED $55,140 $68,240 $6,360
382,474
kWh
$17,710
-
kW-mo/yr
$(-4,960.0)
-
MMBtu
$70
-
Tgal
- $17,980 - $17,900 $80
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs