| Assessment Year | 2000 |
|---|---|
| Principal Product | sealants, coatings, and adhesives |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
150,000
ft2
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,149 | 3,497,069 |
kWh
|
$0.035 |
| Electricity Demand | $65,913 | 8,681 |
kW-mo/yr
|
$7.59 |
| Electricity Fees | $4,413 | - |
|
- |
| Natural Gas | $52,511 | 12,306 |
MMBtu
|
$4.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,730 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $5,320 | $10,000 | - |
$5,320
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,970 | $2,320 |
$650
23,154
kWh
|
$1,320
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,300 | $1,700 | - | - |
$1,300
-
MMBtu
|
- | - | - | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,000 | $2,360 | - | - |
$1,000
-
MMBtu
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $450 | $270 |
$810
29,015
kWh
|
$420
-
kW-mo/yr
|
- | - | $(-780.0) | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10 | - |
$310
10,844
kWh
|
$190
-
kW-mo/yr
|
- | - | $(-150.0) | $(-340.0) | |
| 07 | 3.6192: Use a less expensive method of waste removal | $120 | - | - | - | - |
$130
-
lb
|
- | $(-10.0) | |
| 08 | 2.8113: Purchase gas directly from a contract gas supplier | $9,860 | $500 | - | - |
$9,860
-
MMBtu
|
- | - | - | |
| 09 | 4.423: Move product using mechanical means | $5,280 | $6,720 |
$50
1,758
kWh
|
$30
-
kW-mo/yr
|
- | - | $360 | $4,840 | |
| TOTAL RECOMMENDED | $25,310 | $23,870 |
$1,820
64,771
kWh
|
$7,280
-
kW-mo/yr
|
$12,160
-
MMBtu
|
$130
-
lb
|
$(-570.0) | $4,490 | ||
| TOTAL IMPLEMENTED | $6,730 | $9,350 |
$860
30,773
kWh
|
$450
-
kW-mo/yr
|
$1,000
-
MMBtu
|
- | $(-420.0) | $4,840 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs