ITAC Assessment: CO0448
ITAC logo
ITAC Assessment: CO0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 121,000
ft2
Annual Production 120,000,000
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,501 694,021
kWh
Electricity Demand $47,672 3,460
kW-mo/yr
Electricity Fees $516 -
Natural Gas $10,288 2,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,820 $4,000 n/a - $4,820
-
kW-mo/yr
- - - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $830 $1,080 n/a - - $830
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $430 $30 n/a $430
6,155
kWh
- - - - -
04 2.7224: Reduce space conditioning during non-working hours $380 $150 n/a $80
4,103
kWh
- $300
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $210 n/a $1,110
42,790
kWh
- - $(-780.0) - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $20 - n/a $100
5,569
kWh
$200
-
kW-mo/yr
- $(-40.0) $(-240.0) -
07 4.111: Add equipment/ operators to reduce production bottleneck $160,300 $489,000 n/a - - - - - $160,300
08 4.625: Develop standard operating procedures $36,000 - n/a - - - - - $36,000
TOTAL RECOMMENDED $203,110 $494,470 $1,720
58,617
kWh
$5,020
-
kW-mo/yr
$1,130
-
MMBtu
$(-820.0) $(-240.0) $196,300
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs