ITAC Assessment: CO0442
ITAC logo
ITAC Assessment: CO0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product plexiglass skylights & parts
NAICS
n/a
SIC 3038:
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 77,000
ft2
Annual Production 2,440
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,815 973,623
kWh
Electricity Demand $52,197 3,742
kW-mo/yr
Electricity Fees $204 -
Natural Gas $6,426 1,447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $384,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,620 $330 $820
45,135
kWh
$1,800
-
kW-mo/yr
- - - - - - -
02 2.3191: Use demand controller or load shedder $2,490 $4,000 - $2,490
-
kW-mo/yr
- - - - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $360 $50 $110
6,155
kWh
$250
-
kW-mo/yr
- - - - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $240 $450 - - $240
-
MMBtu
- - - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,720 - - - - $1,720
-
lb
- - - - -
06 3.6192: Use a less expensive method of waste removal $1,352 - - - - - $1,520
-
lb
- $(-168.0) - -
07 4.111: Add equipment/ operators to reduce production bottleneck $318,400 $105,000 - - - - - $(-41,600.0) - - $360,000
08 4.122: Develop standard procedures to improve internal yields $57,400 $10,000 - - - - - - - $57,400 -
TOTAL RECOMMENDED $384,582 $119,830 $930
51,290
kWh
$4,540
-
kW-mo/yr
$240
-
MMBtu
$1,720
-
lb
$1,520
-
lb
$(-41,600.0) $(-168.0) $57,400 $360,000
TOTAL IMPLEMENTED $2,980 $380 $930
51,290
kWh
$2,050
-
kW-mo/yr
- - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs