ITAC Assessment: CO0439
ITAC logo
ITAC Assessment: CO0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product printer supplies
NAICS
n/a
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 300,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $912,404 21,161,489
kWh
Natural Gas $19,213 6,970
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $321,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $218,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2623: Minimize condenser cooling water temperature $187,200 $13,080 - $187,200
02 2.4226: Use / purchase optimum sized compressor $102,440 $400,000 $102,440
2,377,491
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,900 $2,000 $16,900
392,145
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $14,620 $8,400 $14,620
339,390
kWh
-
TOTAL RECOMMENDED $321,160 $423,480 $133,960
3,109,026
kWh
$187,200
TOTAL IMPLEMENTED $218,720 $23,480 $31,520
731,535
kWh
$187,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs