ITAC Assessment: CO0436
ITAC logo
ITAC Assessment: CO0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product concrete landscape products
NAICS
n/a
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 20,000
ft2
Annual Production 110,000
ton
Production Hrs. Annual 6,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,382 1,043,963
kWh
Electricity Demand $27,834 3,510
kW-mo/yr
Electricity Fees $1,014 -
Natural Gas $20,779 5,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $566 $226
7,913
kWh
$115
-
kW-mo/yr
- - - - - $(-200.0) - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $180 $800 - - $180
-
MMBtu
- - - - - - -
03 3.6192: Use a less expensive method of waste removal $5,460 - - - - - $5,460
-
lb
- - - - -
04 4.625: Develop standard operating procedures $31,100 - - - - - - $23,900 $4,200 - - $3,000
05 4.631: Install an uninteruptable power supply $19,090 $75,000 - - - $(-12,010.0)
-
MMBtu
- $23,900 $4,200 - $3,000 -
TOTAL RECOMMENDED $55,971 $76,366 $226
7,913
kWh
$115
-
kW-mo/yr
$180
-
MMBtu
$(-12,010.0)
-
MMBtu
$5,460
-
lb
$47,800 $8,400 $(-200.0) $3,000 $3,000
TOTAL IMPLEMENTED $36,701 $566 $226
7,913
kWh
$115
-
kW-mo/yr
- - $5,460
-
lb
$23,900 $4,200 $(-200.0) - $3,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs