ITAC Assessment: CO0431
ITAC logo
ITAC Assessment: CO0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product flavor extracts & herbal products
NAICS
n/a
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 28,500
ft2
Annual Production 24,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,762 2,370,164
kWh
Electricity Demand $33,663 4,119
kW-mo/yr
Electricity Fees $1,054 -
Natural Gas $83,297 16,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $707,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $702,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.4226: Use / purchase optimum sized compressor $16,420 $21,500 $10,750
351,700
kWh
$5,670
-
kW-mo/yr
- - - - - -
02 2.1222: Install turbulators $1,830 $3,630 - - $1,830
-
MMBtu
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,340 $610 $880
28,722
kWh
$460
-
kW-mo/yr
- - - - - -
04 3.1182: Make a new by-product $4,350 $19,100 - - - $5,400
-
lb
$(-1,050.0) - - -
05 3.6192: Use a less expensive method of waste removal $370 - - - - $370
-
lb
- - - -
06 4.114: Add/modify equipment to improve drying process $638,100 - - - - - - $60,600 - $577,500
07 4.431: Train operators for maximum operating efficiency $44,640 - - - - - $(-86,400.0) - $131,040 -
TOTAL RECOMMENDED $707,050 $44,840 $11,630
380,422
kWh
$6,130
-
kW-mo/yr
$1,830
-
MMBtu
$5,770
-
lb
$(-87,450.0) $60,600 $131,040 $577,500
TOTAL IMPLEMENTED $702,330 $25,740 $11,630
380,422
kWh
$6,130
-
kW-mo/yr
$1,830
-
MMBtu
- $(-86,400.0) $60,600 $131,040 $577,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs