ITAC Assessment: CO0430
ITAC logo
ITAC Assessment: CO0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product pharmaceuticals and herbal extracts
NAICS
n/a
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area 55,000
ft2
Annual Production 121,300
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,192 3,398,300
kWh
Electricity Demand $94,945 6,750
kW-mo/yr
Electricity Fees $204 -
Natural Gas $130,410 38,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $696,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,060 $12,077 $1,358
73,857
kWh
$1,702
-
kW-mo/yr
- - - - -
02 2.1222: Install turbulators $1,770 $5,750 - - $1,770
-
MMBtu
- - - -
03 2.4221: Install compressor air intakes in coolest locations $1,470 $1,280 $720
39,273
kWh
$750
-
kW-mo/yr
- - - - -
04 3.3125: Use distillation, evaporation to remove contaminants $(-210.0) $2,000 $(-160.0)
(-9,086)
kWh
$(-390.0)
-
kW-mo/yr
- $1,690
-
gal
- $(-1,350.0) -
05 3.6125: Sell combustible waste $15,970 $56,700 - - $(-2,280.0)
-
MMBtu
- $18,250
-
lb
- -
06 4.114: Add/modify equipment to improve drying process $674,900 $1,645,000 - - - - - - $674,900
TOTAL RECOMMENDED $696,960 $1,722,807 $1,918
104,044
kWh
$2,062
-
kW-mo/yr
$(-510.0)
-
MMBtu
$1,690
-
gal
$18,250
-
lb
$(-1,350.0) $674,900
TOTAL IMPLEMENTED $20,290 $72,057 $1,918
104,044
kWh
$2,062
-
kW-mo/yr
$(-2,280.0)
-
MMBtu
$1,690
-
gal
$18,250
-
lb
$(-1,350.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Increase in Production Savings