ITAC Assessment: AS0332
ITAC logo
ITAC Assessment: AS0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Canvas boat tops and covers
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 46,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 4,572
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,946 407,048
kWh
Electricity Demand $3,800 1,544
kW-mo/yr
Electricity Fees $2,805 -
Natural Gas $5,366 472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $909 $4,165 $615
10,719
kWh
$247
-
kW-mo/yr
- $47
02 2.7135: Install occupancy sensors $373 $1,050 $373
6,175
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,133 $750 $904
14,952
kWh
$229
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $580 $1,750 $404
7,147
kWh
$176
-
kW-mo/yr
- -
05 4.424: Improve space comfort conditioning $75,184 $3,302 - - $75,184 -
TOTAL RECOMMENDED $78,179 $11,017 $2,296
38,993
kWh
$652
-
kW-mo/yr
$75,184 $47
TOTAL IMPLEMENTED $909 $4,165 $615
10,719
kWh
$247
-
kW-mo/yr
- $47
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs