ITAC Assessment: CO0427
ITAC logo
ITAC Assessment: CO0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product bricks
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 55,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,493 1,438,453
kWh
Electricity Demand $74,207 10,225
kW-mo/yr
Electricity Fees $1,666 -
Natural Gas $235,263 90,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $500 $2,082 $197
11,137
kWh
$303
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $290 $1,000 $90
5,275
kWh
$200
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $240 $40 $70
4,103
kWh
$170
-
kW-mo/yr
- - -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $210 - - - $210
-
lb
- -
05 4.621: Use fixtures to reduce machine changeout times $34,700 $300,000 - - - - $34,700
06 4.621: Use fixtures to reduce machine changeout times $6,080 $30,000 - - - - $6,080
07 4.653: Maintain/enlarge a stock of spare parts $18,250 $27,000 - - - $18,250 -
TOTAL RECOMMENDED $60,270 $360,122 $357
20,515
kWh
$673
-
kW-mo/yr
$210
-
lb
$18,250 $40,780
TOTAL IMPLEMENTED $19,280 $30,122 $357
20,515
kWh
$673
-
kW-mo/yr
- $18,250 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs