Assessment Year | 1998 |
---|---|
Principal Product | wireless communications equipt. |
NAICS |
n/a
|
SIC | 3661: Telephone and Telegraph Apparatus |
Sales Range | $5 M to 10M |
# of Employees | 250 |
Plant Area |
76,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,667 | 4,729,191 |
kWh
|
$0.038 |
Electricity Demand | $50,744 | 11,126 |
kW-mo/yr
|
$4.56 |
Electricity Fees | $4,872 | - |
|
- |
Natural Gas | $11,087 | 2,796 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,121 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,333 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,288 | $6,148 |
$543
27,550
kWh
|
$745
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,694 | $9,850 |
$1,694
31,067
kWh
|
- | - | |
03 | 2.7122: Disconnect ballasts | $5,060 | $3,330 |
$2,080
71,219
kWh
|
$2,980
-
kW-mo/yr
|
- | |
04 | 2.7122: Disconnect ballasts | $1,230 | $900 |
$1,230
22,567
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $149 | $114 |
$149
2,638
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $220 | $300 |
$90
2,931
kWh
|
$130
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $220 | $670 |
$160
5,862
kWh
|
$60
-
kW-mo/yr
|
- | |
08 | 3.6192: Use a less expensive method of waste removal | $1,260 | - | - | - |
$1,260
-
lb
|
|
TOTAL RECOMMENDED | $11,121 | $21,312 |
$5,946
163,834
kWh
|
$3,915
-
kW-mo/yr
|
$1,260
-
lb
|
||
TOTAL IMPLEMENTED | $4,333 | $10,864 |
$3,073
56,272
kWh
|
- |
$1,260
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs