Assessment Year | 1998 |
---|---|
Principal Product | asphalt shingles |
NAICS |
n/a
|
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
180,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,460 | 2,882,181 |
kWh
|
$0.016 |
Electricity Demand | $86,397 | 6,379 |
kW-mo/yr
|
$13.54 |
Electricity Fees | $3,576 | - |
|
- |
Natural Gas | $106,709 | 41,042 |
MMBtu
|
$2.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $352,303 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $274,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $290 | $523 |
$107
6,155
kWh
|
$183
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,480 | $100 |
$590
34,291
kWh
|
$890
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $460 | $660 |
$180
10,551
kWh
|
$280
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 3.5314: Use in-process recycling whenever possible | $102,860 | $72,000 | - | - |
$(-740.0)
-
MMBtu
|
- |
$12,600
-
lb
|
- | $91,000 | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $68,610 | $200,000 |
$(-8,730.0)
(-503,810)
kWh
|
$(-13,100.0)
-
kW-mo/yr
|
- | - |
$90,440
-
lb
|
- | - | - | |
06 | 3.4111: Use closed cycle process to minimize waste water production | $26,243 | $21,600 |
$(-750.0)
(-43,376)
kWh
|
$(-1,120.0)
-
kW-mo/yr
|
- |
$12,347
-
Tgal
|
- | - | - |
$15,766
-
Tgal
|
|
07 | 3.1192: Reduce scrap production | $8,840 | $45,000 | - | - | - | - |
$8,840
-
lb
|
- | - | - | |
08 | 4.441: Install automatic packing equipment | $143,520 | $17,500 | - | - | - | - | - | $143,520 | - | - | |
TOTAL RECOMMENDED | $352,303 | $357,383 |
$(-8,603.0)
(-496,189)
kWh
|
$(-12,867.0)
-
kW-mo/yr
|
$(-740.0)
-
MMBtu
|
$12,347
-
Tgal
|
$111,880
-
lb
|
$143,520 | $91,000 |
$15,766
-
Tgal
|
||
TOTAL IMPLEMENTED | $274,393 | $111,723 |
$(-53.0)
(-2,930)
kWh
|
$(-47.0)
-
kW-mo/yr
|
$(-740.0)
-
MMBtu
|
$12,347
-
Tgal
|
$12,600
-
lb
|
$143,520 | $91,000 |
$15,766
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs