ITAC Assessment: MI0061
ITAC logo
ITAC Assessment: MI0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed carton boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 68,706
ft2
Annual Production 3,327,775
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,223 3,763,932
kWh
Electricity Demand $79,458 9,646
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $2,497 $8,673 $1,915
27,342
kWh
$582
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $3,605 $169 $3,605
51,500
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $974 $332 $974
13,914
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $2,962 $6 $2,962
42,307
kWh
-
05 2.7135: Install occupancy sensors $524 $111 $524
7,488
kWh
-
06 2.6218: Turn off equipment when not in use $7,157 $147 $7,157
102,241
kWh
-
07 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $27,760 $2,808 $27,760
396,571
kWh
-
TOTAL RECOMMENDED $45,479 $12,246 $44,897
641,363
kWh
$582
-
kW-mo/yr
TOTAL IMPLEMENTED $11,617 $596 $11,617
165,950
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs