ITAC Assessment: CO0397
ITAC logo
ITAC Assessment: CO0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product injection molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 96,600
ft2
Annual Production 621
ton
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,347 3,385,111
kWh
Electricity Demand $105,204 8,377
kW-mo/yr
Electricity Fees $144 -
Natural Gas $38,609 10,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $903 $1,277 $353
20,809
kWh
$550
-
kW-mo/yr
- - - - - -
02 2.7124: Make a practice of turning off lights when not needed $830 - $830
49,238
kWh
- - - - - - -
03 2.4221: Install compressor air intakes in coolest locations $560 $580 $250
14,654
kWh
$310
-
kW-mo/yr
- - - - - -
04 2.4133: Use most efficient type of electric motors $88 $163 $38
2,345
kWh
$50
-
kW-mo/yr
- - - - - -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $15,200 - - - - $2,720
-
lb
- - - $12,480
06 3.3125: Use distillation, evaporation to remove contaminants $3,520 $3,300 $(-10.0)
(-293)
kWh
- $3,530
-
gal
- - - - -
07 3.3128: Utilize other methods to remove contaminants $900 $1,660 - - $1,090
-
gal
- - $(-190.0) - -
08 3.5248: Separate and recycle scrap metal to foundry or for sale $240 - - - - $240
-
lb
- - - -
09 4.651: Install back-up equipment $112,270 $50,000 $(-6,320.0)
(-374,560)
kWh
$(-14,320.0)
-
kW-mo/yr
- - $(-101,090.0) - $234,000 -
TOTAL RECOMMENDED $134,511 $56,980 $(-4,859.0)
(-287,807)
kWh
$(-13,410.0)
-
kW-mo/yr
$4,620
-
gal
$2,960
-
lb
$(-101,090.0) $(-190.0) $234,000 $12,480
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs