ITAC Assessment: CO0387
ITAC logo
ITAC Assessment: CO0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product dried bean products
NAICS
n/a
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 52,130
ft2
Annual Production 19,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,672 1,483,880
kWh
Electricity Demand $43,324 2,846
kW-mo/yr
Electricity Fees $156 -
Natural Gas $184,777 68,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings Increase in Production Savings
01 2.2437: Recover waste heat from equipment $6,360 $8,400 $(-180.0)
(-9,965)
kWh
$(-280.0)
-
kW-mo/yr
$6,820
-
MMBtu
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,130 $1,500 - - $2,130
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $289 $288 $115
6,155
kWh
$174
-
kW-mo/yr
- - - -
04 2.2135: Repair and eliminate steam leaks $670 $140 - - $670
-
MMBtu
- - -
05 2.4239: Eliminate or reduce compressed air usage $380 $430 $150
8,499
kWh
$230
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $220 $290 $90
4,689
kWh
$130
-
kW-mo/yr
- - - -
07 3.3122: Use filtration, centrifuging to remove contaminants $18,030 $4,000 - - - $18,030
-
Tgal
- -
08 4.651: Install back-up equipment $33,500 $90,000 - - - - - $33,500
09 4.123: Reduce defects by reducing product tipping $15,600 $21,000 - - - - $15,600 -
TOTAL RECOMMENDED $77,179 $126,048 $175
9,378
kWh
$254
-
kW-mo/yr
$9,620
-
MMBtu
$18,030
-
Tgal
$15,600 $33,500
TOTAL IMPLEMENTED $77,179 $126,048 $175
9,378
kWh
$254
-
kW-mo/yr
$9,620
-
MMBtu
$18,030
-
Tgal
$15,600 $33,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs