ITAC Assessment: CO0386
ITAC logo
ITAC Assessment: CO0386
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product kitchen and bath countertops
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 42,500
ft2
Annual Production 637
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,846 729,191
kWh
Electricity Demand $33,460 2,481
kW-mo/yr
Electricity Fees $309 -
Natural Gas $15,857 4,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,204 $7,390 $537
29,601
kWh
$1,667
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,310 $540 $500
27,550
kWh
$1,810
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $960 $380 $210
11,430
kWh
$750
-
kW-mo/yr
- - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $490 $1,870 - - $490
-
MMBtu
- - -
05 3.1121: Use more efficient adhesive applicators $16,000 $30,000 - - - - $16,000 -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $250 - - - - $250
-
lb
- -
07 4.514: Re-arrange equipment layout to reduce handling costs $156,000 $7,470 - - - - - $156,000
08 4.123: Reduce defects by reducing product tipping $9,540 $1,350 - - - $300
-
lb
$6,720 $2,520
TOTAL RECOMMENDED $187,754 $49,000 $1,247
68,581
kWh
$4,227
-
kW-mo/yr
$490
-
MMBtu
$550
-
lb
$22,720 $158,520
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs