ITAC Assessment: MS0406
ITAC logo
ITAC Assessment: MS0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aluminum and LSA Chemical
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 21
Plant Area 64,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 2,808
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,068 384,508
kWh
Electricity Fees $3,771 -
Natural Gas $100,736 15,180
MMBtu
Waste Disposal Costs
Water Usage $10,045 2,627
Tgal
TOTAL YEARLY COSTS $164,619
RECOMMENDED SAVINGS* $24,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $17,347 $165,000 - $17,347
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,570 - $1,570
12,076
kWh
-
03 2.6218: Turn off equipment when not in use $5,220 - $5,220
40,152
kWh
-
TOTAL RECOMMENDED $24,137 $165,000 $6,790
52,227
kWh
$17,347
-
MMBtu
TOTAL IMPLEMENTED $5,220 - $5,220
40,152
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs