ITAC Assessment: CO0384
ITAC logo
ITAC Assessment: CO0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product electrosurgical equipment
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 67,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,158 1,085,873
kWh
Electricity Demand $25,832 3,080
kW-mo/yr
Electricity Fees $1,317 -
Natural Gas $9,473 2,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,711 $2,985 $1,004
26,377
kWh
$707
-
kW-mo/yr
- - - - - -
02 2.4226: Use / purchase optimum sized compressor $1,050 $4,840 $700
18,464
kWh
$350
-
kW-mo/yr
- - - - - -
03 2.7224: Reduce space conditioning during non-working hours $920 $300 - - $920
-
MMBtu
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $530 $500 $800
21,102
kWh
- $(-270.0)
-
MMBtu
- - - - -
05 3.8121: Cover containers to minimize evaporative losses $1,680 $10,000 - - - - - - $1,680 -
06 3.3122: Use filtration, centrifuging to remove contaminants $620 $760 - - - $(-20.0)
-
gal
$720
-
lb
- $(-80.0) -
07 4.431: Train operators for maximum operating efficiency $26,000 $4,000 - - - - - - - $26,000
08 4.112: Replace old machine with new automatic multi-station tool $10,500 $30,000 - - - - - $10,620 $(-120.0) -
TOTAL RECOMMENDED $43,011 $53,385 $2,504
65,943
kWh
$1,057
-
kW-mo/yr
$650
-
MMBtu
$(-20.0)
-
gal
$720
-
lb
$10,620 $1,480 $26,000
TOTAL IMPLEMENTED $27,711 $6,985 $1,004
26,377
kWh
$707
-
kW-mo/yr
- - - - - $26,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs