ITAC Assessment: CO0383
ITAC logo
ITAC Assessment: CO0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product automotive ic sensors
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 111,000
ft2
Annual Production 6,600
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,797 11,693,728
kWh
Electricity Demand $145,714 19,480
kW-mo/yr
Electricity Fees $14,520 -
Natural Gas $100,212 25,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,985,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Water Consumption Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,660 $28,150 $4,910
174,091
kWh
$2,750
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $557 $980 $409
14,361
kWh
$148
-
kW-mo/yr
- - - - -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $3,770 $5,700 - - $3,770
-
MMBtu
- - - -
04 2.4221: Install compressor air intakes in coolest locations $350 $590 $260
9,086
kWh
$90
-
kW-mo/yr
- - - - -
05 3.4115: Recover and reuse cooling water $1,320 $1,580 - - - $340
-
Tgal
- $980
-
Tgal
-
06 3.6192: Use a less expensive method of waste removal $1,120 $160 - - - - $1,120
-
lb
- -
07 4.122: Develop standard procedures to improve internal yields $1,971,000 $100,000 - - - - - - $1,971,000
TOTAL RECOMMENDED $1,985,777 $137,160 $5,579
197,538
kWh
$2,988
-
kW-mo/yr
$3,770
-
MMBtu
$340
-
Tgal
$1,120
-
lb
$980
-
Tgal
$1,971,000
TOTAL IMPLEMENTED $9,887 $31,300 $5,579
197,538
kWh
$2,988
-
kW-mo/yr
- $340
-
Tgal
- $980
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Water Consumption Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs