ITAC Assessment: CO0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product automotive hood protectors
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 53,000
ft2
Annual Production 1,092,000
pieces
Production Hrs. Annual 5,408
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,212 2,031,653
kWh
Electricity Demand $55,393 4,958
kW-mo/yr
Electricity Fees $29 -
Natural Gas $8,623 2,222
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $531,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $517,560 $5,000 $(-470.0)
(-27,257)
kWh
$(-670.0)
-
kW-mo/yr
- - $81,900 - $436,800
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,610 $50,000 $5,490
317,702
kWh
$7,380
-
kW-mo/yr
$(-5,260.0)
-
MMBtu
- - - -
03 2.6218: Turn off equipment when not in use $2,810 $6,710 $2,810
162,368
kWh
- - - - - -
04 3.8142: Distill contaminated solvents for reuse $1,865 $3,550 $(-5.0)
(-293)
kWh
- - $590
-
gal
$500 $780 -
05 2.7111: Reduce illumination to minimum necessary levels $850 $290 $350
20,223
kWh
$500
-
kW-mo/yr
- - - - -
06 2.7313: Recycle air for heating, ventilation and air conditioning $840 $560 $(-10.0)
(-586)
kWh
$(-10.0)
-
kW-mo/yr
$860
-
MMBtu
- - - -
07 2.4221: Install compressor air intakes in coolest locations $300 $280 $120
7,034
kWh
$180
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $531,835 $66,390 $8,285
479,191
kWh
$7,380
-
kW-mo/yr
$(-4,400.0)
-
MMBtu
$590
-
gal
$82,400 $780 $436,800
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs