Assessment Year | 1997 |
---|---|
Principal Product | labels |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
38,000
ft2
|
Annual Production | 23,000,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $17,565 | 679,660 |
kWh
|
$0.026 |
Electricity Demand | $17,546 | 2,364 |
kW-mo/yr
|
$7.42 |
Natural Gas | $21,236 | 4,485 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,045 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $111,502 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $45,488 | $20,000 |
$(-203.0)
(-7,913)
kWh
|
$(-522.0)
-
kW-mo/yr
|
$8,713
-
MMBtu
|
- | $37,500 | - | - | - | |
02 | 3.1191: Change procedures / equipment / operating conditions | $30,900 | $30,400 | - | - | - | - | $15,000 | $1,800 | $14,100 | - | |
03 | 4.441: Install automatic packing equipment | $30,000 | $20,000 | - | - | - | - | $30,000 | - | - | - | |
04 | 3.7198: Reduce / eliminate use of disposable product | $2,388 | $850 | - | - | - |
$90
-
lb
|
$750 | - | - | $1,548 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,251 | $4,806 |
$563
21,688
kWh
|
$688
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $155 | $16 |
$68
2,638
kWh
|
$87
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.8121: Apply for tax-free status for energy purchases | $743 | $250 | - | - | - | - | - | $743 | - | - | |
08 | 2.1224: Replace boiler | $3,120 | $34,835 | - | - |
$3,120
-
MMBtu
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $114,045 | $111,157 |
$428
16,413
kWh
|
$253
-
kW-mo/yr
|
$11,833
-
MMBtu
|
$90
-
lb
|
$83,250 | $2,543 | $14,100 | $1,548 | ||
TOTAL IMPLEMENTED | $111,502 | $110,291 |
$360
13,775
kWh
|
$166
-
kW-mo/yr
|
$11,833
-
MMBtu
|
- | $82,500 | $2,543 | $14,100 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs