ITAC Assessment: IC0219
ITAC logo
ITAC Assessment: IC0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Vinyl Tile Flooring
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 285
Plant Area 350,000
ft2
Annual Production 231
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,568,583 44,748,598
kWh
Electricity Demand $593,440 96,756
kW-mo/yr
Electricity Fees $299,510 -
Natural Gas $788,631 204,230
MMBtu
TOTAL YEARLY COSTS $4,250,165
RECOMMENDED SAVINGS* $101,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1224: Replace boiler $68,168 $25,600 - - $68,168
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $30,480 $17,728 - - $30,480
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,919 $737 $2,163
36,044
kWh
$756
-
kW-mo/yr
-
TOTAL RECOMMENDED $101,567 $44,065 $2,163
36,044
kWh
$756
-
kW-mo/yr
$98,648
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs