ITAC Assessment: CO0366
ITAC logo
ITAC Assessment: CO0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product cake mixes and food oils
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 300,000
ft2
Annual Production 115,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,829 6,747,362
kWh
Electricity Demand $82,086 16,840
kW-mo/yr
Electricity Fees $503 -
Natural Gas $226,121 103,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,879

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings By-product Production Savings
01 3.7212: Improved material handling (mixing and transfer) $41,785 - - - - $2,808
-
Tgal
$1,350
-
lb
- $37,440 $187
-
Tgal
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,245 $6,426 $1,544
55,100
kWh
$701
-
kW-mo/yr
- - - - - - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $2,840 $7,700 - - - - $2,120
-
lb
$(-360.0) - - $1,080
04 2.2153: Close off unneeded steam lines $2,610 - - - $2,610
-
MMBtu
- - - - - -
05 2.4133: Use most efficient type of electric motors $329 $400 $191
6,741
kWh
$138
-
kW-mo/yr
- - - - - - -
06 2.4221: Install compressor air intakes in coolest locations $1,850 $1,860 $1,270
45,135
kWh
$580
-
kW-mo/yr
- - - - - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,060 $2,690 $650
23,154
kWh
$410
-
kW-mo/yr
- - - - - - -
TOTAL RECOMMENDED $52,719 $19,076 $3,655
130,130
kWh
$1,829
-
kW-mo/yr
$2,610
-
MMBtu
$2,808
-
Tgal
$3,470
-
lb
$(-360.0) $37,440 $187
-
Tgal
$1,080
TOTAL IMPLEMENTED $49,879 $11,376 $3,655
130,130
kWh
$1,829
-
kW-mo/yr
$2,610
-
MMBtu
$2,808
-
Tgal
$1,350
-
lb
- $37,440 $187
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs