ITAC Assessment: CO0364
ITAC logo
ITAC Assessment: CO0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product motor vehicle instrument panels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 103,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,459 1,772,567
kWh
Electricity Demand $46,870 4,663
kW-mo/yr
Electricity Fees $(-2,110.0) -
Natural Gas $12,658 3,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,901 $64,178 $7,715
241,794
kWh
$5,186
-
kW-mo/yr
- -
02 2.7132: Install timers on light switches in little used areas $7,840 $7,000 $7,840
245,897
kWh
- - -
03 3.2172: Use automatic cleaning equipment $3,520 $3,600 - - $2,080 $1,440
04 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $2,220 $400
12,309
kWh
$260
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $570 $220 $400
12,309
kWh
$170
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $55 $60 $35
1,172
kWh
$20
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $280 $360 $110
3,224
kWh
$170
-
kW-mo/yr
- -
TOTAL RECOMMENDED $25,826 $77,638 $16,500
516,705
kWh
$5,806
-
kW-mo/yr
$2,080 $1,440
TOTAL IMPLEMENTED $4,425 $4,240 $545
16,705
kWh
$360
-
kW-mo/yr
$2,080 $1,440
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs