Assessment Year | 1995 |
---|---|
Principal Product | Integrated microcircuits |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
150,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $907,143 | 23,922,919 |
kWh
|
$0.038 |
Natural Gas | $150,248 | 46,805 |
MMBtu
|
$3.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,640 | $54,100 |
$20,640
499,121
kWh
|
- | - | |
02 | 3.4115: Recover and reuse cooling water | $18,410 | $2,190 | - |
$8,460
-
Tgal
|
$9,950
-
Tgal
|
|
03 | 2.4133: Use most efficient type of electric motors | $5,690 | $7,000 |
$5,690
147,714
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $3,030 | $2,280 |
$3,030
148,007
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,860 | $4,470 |
$1,860
44,842
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,690 | $470 |
$1,690
46,600
kWh
|
- | - | |
07 | 2.4131: Size electric motors for peak operating efficiency | $990 | $10,410 |
$990
24,033
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,310 | $80,920 |
$33,900
910,317
kWh
|
$8,460
-
Tgal
|
$9,950
-
Tgal
|
||
TOTAL IMPLEMENTED | $44,740 | $63,290 |
$26,330
646,835
kWh
|
$8,460
-
Tgal
|
$9,950
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs