ITAC Assessment: CO0380
ITAC logo
ITAC Assessment: CO0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product telephone directories
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 270,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,917 19,966,003
kWh
Electricity Demand $612,049 39,247
kW-mo/yr
Electricity Fees $264 -
Natural Gas $129,652 37,963
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,603 $27,027 $3,723
228,605
kWh
$4,880
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $761 $883 $353
21,688
kWh
$408
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $3,320 $2,700 $1,440
88,218
kWh
$1,880
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,690 $2,180 $1,170
72,098
kWh
$1,520
-
kW-mo/yr
- - -
05 3.8132: Use less toxic and volatile solvent substitutes $2,070 $3,520 - - $3,240
-
gal
- $(-1,170.0)
06 3.6192: Use a less expensive method of waste removal $1,250 - - - - $1,250
-
lb
-
TOTAL RECOMMENDED $18,694 $36,310 $6,686
410,609
kWh
$8,688
-
kW-mo/yr
$3,240
-
gal
$1,250
-
lb
$(-1,170.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs