Assessment Year | 1995 |
---|---|
Principal Product | Specialty bolts |
NAICS |
n/a
|
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
30,000
ft2
|
Annual Production | 1,170,000
lb
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,933 | 710,434 |
kWh
|
$0.080 |
Natural Gas | $61,013 | 24,711 |
MMBtu
|
$2.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,300 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $32,610 | $165,000 | - |
$32,610
-
MMBtu
|
- | - | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $2,980 | $2,670 | - | - |
$3,360
-
gal
|
$(-20.0)
-
lb
|
$(-360.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,690 | $100 |
$1,690
24,326
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,660 | $5,920 |
$1,660
21,981
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,250 | $780 |
$1,250
17,878
kWh
|
- | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,110 | $2,080 |
$1,110
17,878
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $41,300 | $176,550 |
$5,710
82,063
kWh
|
$32,610
-
MMBtu
|
$3,360
-
gal
|
$(-20.0)
-
lb
|
$(-360.0) | ||
TOTAL IMPLEMENTED | $41,300 | $176,550 |
$5,710
82,063
kWh
|
$32,610
-
MMBtu
|
$3,360
-
gal
|
$(-20.0)
-
lb
|
$(-360.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs