ITAC Assessment: CO0344
ITAC logo
ITAC Assessment: CO0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Specialty bolts
NAICS
n/a
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 30,000
ft2
Annual Production 1,170,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,933 710,434
kWh
Natural Gas $61,013 24,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $32,610 $165,000 - $32,610
-
MMBtu
- - -
02 3.8132: Use less toxic and volatile solvent substitutes $2,980 $2,670 - - $3,360
-
gal
$(-20.0)
-
lb
$(-360.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $100 $1,690
24,326
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,660 $5,920 $1,660
21,981
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $1,250 $780 $1,250
17,878
kWh
- - - -
06 2.4133: Use most efficient type of electric motors $1,110 $2,080 $1,110
17,878
kWh
- - - -
TOTAL RECOMMENDED $41,300 $176,550 $5,710
82,063
kWh
$32,610
-
MMBtu
$3,360
-
gal
$(-20.0)
-
lb
$(-360.0)
TOTAL IMPLEMENTED $41,300 $176,550 $5,710
82,063
kWh
$32,610
-
MMBtu
$3,360
-
gal
$(-20.0)
-
lb
$(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs