Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed circuit boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 30,000
ft2
Annual Production 979,400
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,946 1,706,331
kWh
Natural Gas $5,723 1,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 3.5242: Recover metals from spent solutions and recycle $96,090 $153,400 - - $8,640
-
Tgal
$13,230
-
gal
- $74,220
02 3.3127: Use adsorption, ion exchange to remove contaminants $56,560 $174,500 - - $51,500
-
Tgal
- $2,030
-
lb
$3,030
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,910 $13,270 $4,910
89,977
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $1,190 $1,240 $1,190
24,326
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $1,000 $720 $1,000
19,930
kWh
- - - - -
06 2.2437: Recover waste heat from equipment $820 $600 - $820
-
MMBtu
- - - -
07 2.4131: Size electric motors for peak operating efficiency $530 - $530
11,137
kWh
- - - - -
TOTAL RECOMMENDED $161,100 $343,730 $7,630
145,370
kWh
$820
-
MMBtu
$60,140
-
Tgal
$13,230
-
gal
$2,030
-
lb
$77,250
TOTAL IMPLEMENTED $7,450 $15,110 $6,630
125,440
kWh
$820
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings