ITAC Assessment: CO0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Amusement park rides
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 44,000
ft2
Annual Production 75
pieces
Production Hrs. Annual 2,880
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,516 698,710
kWh
Natural Gas $12,281 2,929
MMBtu
Fuel Oil #2 $2,370 468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,310 $16,550 $5,310
77,667
kWh
-
02 2.4133: Use most efficient type of electric motors $830 $260 $830
8,206
kWh
-
03 2.2437: Recover waste heat from equipment $620 $650 - $620
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $260 $500
8,499
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $250 $250 $250
3,224
kWh
-
TOTAL RECOMMENDED $7,510 $17,970 $6,890
97,596
kWh
$620
-
MMBtu
TOTAL IMPLEMENTED $6,890 $17,320 $6,890
97,596
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs