ITAC Assessment: CO0339
ITAC logo
ITAC Assessment: CO0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 40,000
ft2
Annual Production 850,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,574 1,641,266
kWh
Natural Gas $18,409 4,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,190 $11,090 $4,190
82,943
kWh
-
02 2.6218: Turn off equipment when not in use $3,360 $320 - $3,360
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,870 $640 $1,870
39,566
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,230 $1,110 $1,230
26,671
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,110 $400 $1,110
24,326
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $620 $50 $620
12,016
kWh
-
TOTAL RECOMMENDED $12,380 $13,610 $9,020
185,522
kWh
$3,360
-
MMBtu
TOTAL IMPLEMENTED $8,190 $2,520 $4,830
102,579
kWh
$3,360
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs