Assessment Year | 1995 |
---|---|
Principal Product | Metal Lockers |
NAICS |
n/a
|
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
110,000
ft2
|
Annual Production | 14,000
pieces
|
Production Hrs. Annual | 4,278
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,898 | 1,786,049 |
kWh
|
$0.070 |
Natural Gas | $81,963 | 18,434 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $256,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $236,840 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.2121: Convert to electrostatic powder coating | $222,920 | $92,000 | - | - |
$17,200
-
gal
|
$205,720 | |
02 | 2.2511: Insulate bare equipment | $10,210 | $18,340 | - |
$10,210
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,600 | $130 |
$6,600
85,287
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,560 | $21,980 |
$6,560
91,735
kWh
|
- | - | - | |
05 | 2.7231: Use radiant heater for spot heating | $7,980 | $23,400 | - |
$7,980
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $660 | $170 |
$660
9,672
kWh
|
- | - | - | |
07 | 2.7261: Install timers and/or thermostats | $480 | $300 |
$180
4,103
kWh
|
$300
-
MMBtu
|
- | - | |
08 | 3.8132: Use less toxic and volatile solvent substitutes | $370 | $530 | - | - | - | $370 | |
09 | 2.1122: Re-size charging openings or add a movable door on equipment | $280 | $450 | - |
$280
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $256,060 | $157,300 |
$14,000
190,797
kWh
|
$18,770
-
MMBtu
|
$17,200
-
gal
|
$206,090 | ||
TOTAL IMPLEMENTED | $236,840 | $114,860 |
$13,340
181,125
kWh
|
$580
-
MMBtu
|
$17,200
-
gal
|
$205,720 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs