| Assessment Year | 1995 |
|---|---|
| Principal Product | Plastic Bags |
| NAICS |
n/a
|
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $5 M to 10M |
| # of Employees | 57 |
| Plant Area |
100,000
ft2
|
| Annual Production | 9,500,000
lb
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $194,932 | 4,518,757 |
kWh
|
$0.043 |
| Natural Gas | $10,349 | 2,602 |
MMBtu
|
$3.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,060 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $10,040 | $32,850 |
$10,040
267,292
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,280 | $12,700 |
$22,990
603,458
kWh
|
$(-11,710.0)
-
MMBtu
|
|
| 03 | 2.7231: Use radiant heater for spot heating | $3,470 | $5,400 | - |
$3,470
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,150 | $6,720 |
$3,150
80,305
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,470 | $1,600 |
$2,470
62,427
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $1,590 | $1,940 |
$1,590
40,739
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $520 | $1,770 |
$520
13,482
kWh
|
- | |
| TOTAL RECOMMENDED | $32,520 | $62,980 |
$40,760
1,067,703
kWh
|
$(-8,240.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,060 | $3,540 |
$4,060
103,166
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs